Tuesday, August 28, 2012

R5 Progress

Sorry that I've been slacking off with the updates.  I have been stuck in my build because with 2 problems:

1.  Mounting the Utility Arm Boxes so they are removable
2.  Smoothing out minor imperfections in R5's dome.

Hopefully those will be resolved soon and I can resume the rest of the build.

2 comments:

  1. Hi I have somthing that might help you with your Util arms. Its not my work but it helped me greatly, see this: http://www.brianbonline.com/R2PHOTOS.HTML

    Scroll down the page and 1/2 down he has a great way to make them removable.

    My r2 page: www.a-51x.com

    ReplyDelete
  2. The only problem is I am doing a Styrene Build using David Everett's plans. The Utility Arm Box carriers provide strength for the front of the frame.

    ReplyDelete